How is M Bar C addressing current COVID-19 regulations?
Western Division: 760-744-4131 | Eastern Division: 617-399-8186
    Capture The Moment

     

    Welcome to our Blog

     

     As the industry-recognized carport installation leader, we are committed to providing you with the best quality structure solution. As your project process moves forward, transparency and communication are our priorities.

    Welcome Greg Jones to the M Bar C Team

    Join us in welcoming Greg Jones to the M Bar C team! Greg joined M Bar C as Sales Representative for our new line of DSA-approved Smart Canopies. He is well known in the California School Construction market and has 15 years of experience designing, marketing, and...

    Case Study – Contra Costa

    3.2 Megawatts The 3.2-MW solar power generation system, comprising PV panels mounted on 34 parking canopies in six parking lots at Contra Costa College, Diablo Valley College and Los Medanos College, is the largest ever for a college or university system in North...

    Case Study – Fresno State University

    1.1 Megawatts The large-scale solar power installation at California State University, Fresno will supply 20 percent of the university’s annual power needs. The 1.1-megawatt solar system is expected to save Fresno State more than $13 million in avoided utility costs...

    Press Release: Versa-Canopy PC

    M Bar C Construction’s Versa-Canopy PC was approved August 4, 2015 at the San Diego office of the Division of the State Architect. The Versa-Canopy is an all-steel system that can be configured as a single slope lunch shelter, a gable lunch shelter, or as a walkway...